Showing posts with label our house. Show all posts
Showing posts with label our house. Show all posts

Thursday, December 23, 2010

Nearing Completion


I love going to the property and seeing every new step that is happening. Each step of progress now really makes the house take on a new look. The door jams and trim are completed! All the painting is done! All the tile has been laid! Just the grouting needs to be done. Today my bathroom mirror was hung along with the toilet being installed and all those fun jobs in the bathroom.

On Wednesday we get carpet for the bedrooms-another yeah. And the sun is out today. We've had A LOT of rain recently along with high winds. We've experienced winds like never before. Even our neighbors at The Village said they've never seen anything like it before. The winds were so bad on Sunday evening that is cause a large section of our concrete fencing to fall over. Another section of the fence also suffered damage but it is still standing. The company that supplied our fence is taking partial blame for the fence materials not holding up against the winds and will be replacing some of the fence at their expense. Praise the Lord!!!

{Lindie and Liam love going to the house during lunch time}

{Brian, Bob and Louie laying the tile}

{Living room and passage almost done}
{As you can see, we received a lot of rain}
{Lawrence, or better known as Pops, helped at
the house by varnishing our front and back door}
{Trim painted and is now all installed}
{Our bedroom}
{Liam and Lindie's bedroom}


{measuring our old curtain, and now Susie is hemming them to length}


Since I started this blog post more has been accomplished. This week carpet was installed in the 3 bedrooms. The front door is on and has a lock :) and the back yard has been tilled up and planted with grass seed.

Friday, November 12, 2010

Update on Our House at The Village


Its been a while since I'v posted pictures on the progress being made on our house at The Village.

This week Brian installed the windows, so that really made the house look real. They also started to layout out where the walls are suppose to go and fastening the footplates to the concrete floor. The bathtub and shower are sitting in the house now and the interior of the house has been plastered. Brian started doing this and quickly discovered he needed to hire this part of the house out. He's never plastered before and it was taking him too long.

Pictures are always better-so here ya go.

{back of our house before windows}

{bathtub and shower}

{a local company sent a backhoe and driver to help us on a Saturday.
The were able to backfill the sewer trench, dig a new trench for electrical service and
backfill that trench in one morning}

{Lindie enjoying some raisins off the dirty floor}

{There is always a little bit of time for fun with daddy}

{front of the house with windows in}